Gutter Installation in Minneapolis

jacob installing 6 inch gutter

Free Estimates & Quotes

5.0 Stars - Based on 178 User Reviews

The Kingdom Builders installs seamless gutter systems on homes and commercial buildings across the greater Minneapolis metro. We employ our own in-house crew, not subcontractors.

Whether you're putting gutters on a new build, adding them to a home that's never had them, or extending coverage to a section of roofline that's been dumping water in the wrong place for years, we handle the full installation. We pay attention to detail on sizing, downspout placement, pitch, and flashing. Our guys form every gutter on-site to the exact length your roofline requires, size the system to the actual roof area draining into it, and flash the back edge where it meets the roof so water can't get behind it.

Minneapolis Roofing CompanyGuttersGutter Installation
40 year leafblaster doneright warranty
done right partner badge
home advisor screened and approved badge
home advisor 3 years screened and approved badge
nextdoor neighborhood fave badge 2025
nextdoor neighborhood favorite in 2023

What Proper Gutter Installation Involves

Sizing the system to the roof, not the house

Gutter capacity is driven by the square footage of roof draining into a given run and how steeply that roof is pitched, and not by the size of the home. A modest house with a steep roof and converging valleys can move more water into one corner than a much larger home with a simple hip roof. Getting this wrong means the gutters perform fine in drizzle and fail exactly when it matters.

Our rule of thumb: any run collecting more than roughly 900 square feet of roof area gets 6-inch gutters. So does any run where the roofline funnels multiple valleys into a single point. A U-shaped front entry with two valleys converging overhead is the classic case. Six-inch gutters move 40–50% more water than 5-inch gutters, which is a substantial gain for one additional inch of width.

Downspout count and placement

Undersized gutters are one failure mode. Too few downspouts are the other. A correctly sized gutter that has nowhere to discharge will still back up and overflow. We place downspouts based on run length and volume, and we route discharge away from the foundation, not into a spot that just relocates the erosion problem six feet to the left.

Pitch

Gutters have to be pitched toward the downspouts, but only slightly. Just enough to move water, not enough to see with the naked eye. Our crew sets brackets every 16 to 24 inches and checks pitch with a torpedo level as they go, running the bubble just touching the line rather than centered. It's a small amount of fall. Done right, it drains completely and looks dead level from the ground.

Flashing at the roof edge

This is the step cheap installers skip. If there's no gutter apron or flashing carrying water from the roof deck into the gutter, water runs down the back side of the gutter and directly onto the fascia. On wood fascia, that means rot, and once the fascia goes, the soffit follows. Replacing fascia and soffit on an average home runs $3,000–$5,000. Flashing it correctly during installation costs a fraction of that.

Bracket selection for your fascia

Not every fascia takes a standard bracket. Homes with crown molding on the fascia, or with angled fascia boards, require different hardware, which are roof-hung hangers that slip under the shingles, or T-brackets with a spacer to hold the gutter plumb against an angled surface. We carry all three and use what the house actually calls for.

Gutter Installation Approach

Our Installation Process

This is our step-by-step system for installing new gutters. A typical residential installation is about six hours.

Free On-Site Estimate

A member of our team comes out and measures the full perimeter of the areas you want covered. We sketch the layout, note the dimensions, and identify where downspouts need to go.

Color Matching

We bring a physical color fan and match your gutters to your fascia. If you want downspouts matched to your siding instead of your gutters, we do that too. This is done in person, against the actual house, in daylight.

Approval and Scheduling

You review the drawing and the quote. Once approved, we take a deposit and get you on our schedule.

Installation Day

Our truck-and-trailer unit arrives carrying the seamless gutter machine, aluminum coil, and all hardware. Flat coil feeds into one end of the machine and comes out formed into a continuous gutter, cut to the exact length of your run.

The crew hangs brackets, sets pitch, installs the gutters, flashes the roof edge, and hangs downspouts. Then they clean up the site.

Final Walkthrough and Invoice

We confirm the system is complete and correct, clean up, and send the final invoice.

gutter crew on two ladders installing gutter on new shop

Materials & Specifications

0.032-gauge aluminum. We use heavy 0.032 aluminum coil as our standard. For comparison, the "heavy-duty" aluminum sold at big-box home improvement stores is typically 0.027, and their economy product is 0.019 (which is very dentable). Our 0.032 holds its shape, resists denting, and keeps its paint finish for the long term.

We install 3×3 downspouts. The profile creates a natural vortex where water spins down the downspout rather than tumbling into it. This allows a 3×3 to carry substantially more volume than its dimensions suggest. They're stronger, they resist denting better, they clog less, and they need only a single elbow that can be oriented in any direction. It's a better product, and few other companies in the metro install them.

Color-matched EDCO systems. When your project includes fascia and soffit, we can spec the entire system from EDCO so the colors match exactly.

The best time to add gutter covers is during installation, while the crew and ladders are already on-site. It costs less than a separate visit later and means you won't be back up there cleaning them out every fall.

Formed On-Site

Every gutter we install is custom-made on the job with our KWM Ironman gutter machine.

The purpose of forming gutters on-site is to avoid seams (hence, "seamless" gutters). Seams are always the weak point in a gutter system, so the less you have, the less water escapes. Our longest continuous run to date was roughly 180 feet.

iron man machine inside trailer

Iron Man machine inside trailer

spool of aluminum on iron man machine

Spool of aluminum on machine

k style gutter formed

K style gutters formed

Gutter Installation Cost in Minneapolis

Every home is different, but this is a general estimate of what residential installation costs in our market.

These ranges include materials and labor. If you want a rough budget number before you call, measure the perimeter of the roofline you want covered and multiply. Just know that final pricing depends on roofline complexity, number of stories, corner count, and how many downspouts the system requires.

Financing is available through GreenSky for qualifying projects.

Planning Gutters Into a Larger Exterior Project

If gutters are part of a bigger job like a roof, siding, or a full exterior remodel, the order in which you install each item matters.

The correct order is: roof, then siding, then gutters.

Gutters come off during the roofing tear-off. Siding goes on after the roof is complete. Gutters go back on last, once the fascia is finalized and the siding is done. Installing gutters before siding means they come right back off, and every removal and rehang is another chance to damage the system or the fascia behind it.

Because we run roofing, siding, and gutter crews in-house, we schedule the whole sequence ourselves. You're not coordinating three companies and hoping they show up in the right order.

Planning Gutters Into a Larger Exterior Project

If gutters are part of a bigger job like a roof, siding, or a full exterior remodel, the order in which you install each item matters.

The correct order is: roof, then siding, then gutters.

Gutters come off during the roofing tear-off. Siding goes on after the roof is complete. Gutters go back on last, once the fascia is finalized and the siding is done. Installing gutters before siding means they come right back off, and every removal and rehang is another chance to damage the system or the fascia behind it.

Because we run roofing, siding, and gutter crews in-house, we schedule the whole sequence ourselves. You're not coordinating three companies and hoping they show up in the right order.

scott installing new downspout

Why Homeowners Choose Our Crew for Gutter Installation

Our gutter crew is employed directly by The Kingdom Builders. Most exterior contractors in the Twin Cities subcontract their gutter work. We ran subcontracted gutter crews for a period, but we ended up going back to fix every job they did. So we built our own crew, we trained them on our materials and our standards, and they're the same people who come back if something needs attention under warranty.

We've been doing exteriors since 1998. The Kingdom Builders is a licensed general contractor in Minnesota with over 15 employees across three dedicated crews. 5-star rated on Google, HomeAdvisor, and Angi.

Lifetime labor warranty. Our gutter installations carry a lifetime workmanship warranty.

The Kingdom Builders
5.0 Stars - Based on 178 User Reviews
angieslist logofacebook logogoogle logoguildquality logohomeadvisor logo

Projects & Case Studies

Recent Gutter Projects

Check out our recent projects around the Minneapolis metro. We help churches, businesses, schools, and others secure their property.

Frequently Asked Questions

Restoring Exteriors in Minnesota

“Whatever You Do, Work Heartily, As For The Lord And Not For Men.”

Colossians 3:23